楚峰塑胶制品厂
13928927386

Products

Contact

Chufeng Plastic Products
Tel:0769-82523999
Contact:Ms.Cheng
Phone:13763189989
Add:Dongguan City bridge
home page:en.juyfun168.com

What are the advantages and disadvantages of Dongguan racks?


Advantages and disadvantages
Advantages: Low cost, no power. Disadvantages: Installation complexity, short life. Installation of a waving racks Mounting: waving is usually installed in the balcony to the right, to facilitate the habitual use, from the ground generally 120cm, determined according to the user's height. Expansion screws.
Two top seat installation: to be installed in the balcony on top of the balcony at the top with a ruler to measure the diameter of the lights, and then both sides of the lamp 15cm-30cm between doing a mounting mark (the length of the decision based on the size of the balcony). And then measure the distance between the mark and the edge of the balcony, to determine the width of the top seat is installed according to this distance. Then the length of the lamp as measured from the center balcony, on both sides of the lamp is determined based on laundry bisecting 80cm-100cm beam length, and then measure the distance with the width of four cross-points, which is the intersection of the four top seat hanger mounting position. After determining the location, with the drill hole after hole drilled screws to secure the expansion of the four top seat (such as bars longer than regular size, adjust the distance accordingly).
Note: this side corner by waving two top seat is movable end. The other two are the top seat mounts, the difference between them is that the seat is a two-round activities, activities must be installed in the front seat.
Three installation angle: angle can be mounted on top of the balcony roof or wall, corner distance events top seat 50--70cm, must be a triangle (45 degrees) in the middle of the top seat of the activities, and bade installed in order to maintain the same vertical position line, you can see the drawings. Four wire connections: there are two wire racks set, the first to come up with a first pass through the wire of a corner bearing steel tank, then through the active end of the top seat wheels bearing steel tank (located on the top seat the upper part), and then through the fixed end of the top seat of bearing steel wire slots allow perpendicular to the ground, then set into the roof from the wire, the card is good top seat cover. Also through the other end of the wire bearing steel tank to another corner of the hole, then through the activities of another seat wheels bearing steel tank (the same top seat below), so that the wire is perpendicular to the ground, then set into the roof from the wire card good top seat cover. (The same as the other wire installation method).
The wire is then pulled against the top seat until lob, then pull the wire from the corner, just as a double-stranded; five dry connected at the head end of each wire, wearing lob, lob inside the knot card at the end of the hand; relaxed hand is inside the wire, drop down the hanging rod through the shot, and then went in the hole at the lob tighten fixing screw nails good; finally hanging rod installed on both ends of the plug.
Home | About Chufeng | Products | Image | Certification | News | Industry News | Feedback | Contact
Dongguan Chufeng Plastic Products Factory All rights reserved @ Copyright 2015 【Site Management
Tel:13928927386 Add:Dongguan City bridge
* Web site related materials and resources are from the Internet, if infringement please inform us,
we will remove within 24 hours * Technical Support:Dongguan Website